Devonshire House

London

Installation of Chilled Water Air Conditioning Systems and demand control Ventilation Systems serving high specification offices and meeting rooms. Installation of plumbing services to Tea Points and Office Breakout areas.

AFR installed chilled water air conditioning and demand control ventilation at Devonshire House, serving high specification offices and meeting rooms in Devonshire Square, London. Our team also delivered plumbing to the tea points and breakout areas, giving the client one accountable contractor across every service.

Devonshire House: Chilled Water Air Conditioning and Ventilation for a High-Specification London Office

Location: Devonshire Square, London

‍Sector: High-specification offices

‍Services delivered: Chilled water air conditioning, demand control ventilation, plumbing services

‍Systems installed: Fan coil units, VAV terminal units, air quality sensor controls

AFR Air Conditioning was awarded the air conditioning, ventilation and plumbing installation at Devonshire House in Devonshire Square, London. Our team installed chilled water air conditioning and demand control ventilation systems serving high-specification offices and meeting rooms, along with plumbing services to the tea points and office breakout areas.

About the Project

Devonshire Square is one of London’s most recognisable business addresses, and Devonshire House is a space where the quality of the working environment matters. AFR was proud to be awarded this prestigious project.

The developer provided a large, open-plan office area. Our task was to carry out extensive modifications and additions to turn that space into a working office, with numerous meeting rooms and breakout areas. Each of those spaces needed its own comfortable, well-ventilated environment, and that meant careful design and installation from the first pipe run to the final commissioning checks.

The Challenge

Turning one large open space into many smaller ones changes how the building needs to be heated, cooled and ventilated. A meeting room can go from empty to full in minutes, and a breakout area has very different needs from a quiet office zone.

The key challenges were:

  • Providing reliable heating and cooling to a large number of separate rooms and zones
  • Keeping air fresh in meeting rooms, where occupancy changes throughout the day
  • Making the most of the landlord’s existing chilled water and low temperature hot water (LTHW) provision
  • Delivering plumbing to the tea points and breakout areas alongside the air conditioning and ventilation works

Our Solution

Chilled water air conditioning with fan coil units

Heating and cooling were delivered through fan coil units, connected to the landlord’s chilled water and LTHW supply. Chilled water provides the cooling, while LTHW provides the heating, so a single unit can keep a room comfortable all year round.

This approach suits offices well. Fan coil units are quiet and compact, and they give each space its own local control. Every room can be kept comfortable without relying on a one-size-fits-all setting for the whole floor. If you are considering a similar scheme, our air conditioning installation services cover a wide range of system types for commercial buildings.

Demand control ventilation for meeting rooms

Fresh air is just as important as temperature, particularly in meeting rooms where several people share a small space. To deal with this, we installed a number of individual VAV (variable air volume) terminal units, which adjust how much air is supplied to a room.

Each unit is controlled by air quality sensors located within its meeting room. When a room fills up and air quality changes, the system responds by supplying more fresh air. When the room empties, the supply reduces. This is the principle behind demand control ventilation: air is delivered where and when it is needed, rather than at a constant rate throughout the day. You can find out more about the systems we design and install on our commercial ventilation services page.

Plumbing to tea points and breakout areas

AFR also carried out the plumbing works to the breakout tea point areas. Having one contractor manage air conditioning, ventilation and plumbing meant fewer interfaces to coordinate and a single point of accountability for the client.

Results and Benefits

The completed installation gives Devonshire House:

  • Comfortable heating and cooling in offices and meeting rooms, controlled locally
  • Ventilation that responds to how each room is actually being used
  • Efficient use of the landlord’s chilled water and LTHW services
  • Fully serviced breakout and tea point areas, delivered by the same team

Why Choose AFR for Commercial HVAC Projects

Projects like Devonshire House call for more than installation skills. They need clear planning and close coordination, and an installer who understands how a space will be used once the fit-out is finished.

AFR has over 50 years of experience delivering HVAC installations for businesses across the UK. Our engineers work with fan coil units, VRF and split systems, close control systems and more, and we take the same careful approach whether a project is a single office or a complex multi-room fit-out.

Our expertise goes beyond comfort cooling and ventilation. We also provide refrigeration services for businesses with specialist temperature control needs. Wherever your project sits, you will have one experienced team to work with.

Talk to AFR About Your Next Project

Whether you are fitting out a new office, adapting an existing space or planning a major upgrade, AFR can help you create a comfortable, well-ventilated and efficient environment. Tell us about your project and our team will be happy to talk it through, offer practical advice and discuss how we can help.

Contact AFR today to start the conversation.

Modern office interior ceiling with commercial air conditioning installation​ from AFR

More Projects

Take a look at how we’ve supported businesses across the UK with tailored HVAC and refrigeration solutions.
Each project is designed around the client’s needs, ensuring efficiency, compliance and reliability.

<< Swipe to see projects >>

Butlins

Bognor Regis

Installation of VRF Air Conditioning systems and Heat Recovery Ventilation serving new Theatre and Soft Play Facility.

Dave's Hot Chicken

Multiple Sites

Installation of kitchen ventilation, air conditioning and cold room refrigeration systems at numerous sites including the provision of kitchen exhaust odour and smoke control equipment

Devonshire House

London

Installation of Chilled Water Air Conditioning Systems and demand control Ventilation Systems serving high specification offices and meeting rooms. Installation of plumbing services to Tea Points and Office Breakout areas.

kerb-social-club-kitchen-extract-canopy

Kerb Social Club

Spitalfields Market, London

AFR installed air conditioning, heat recovery and kitchen ventilation with Ansul fire suppression at Kerb Social Club, Spitalfields Market, London. We also designed a discreet exhaust terminal to suit the building’s historic setting.

Oxford Business Park

Oxford

Replacement of roof mounted Water Chiller servicing three story office block.

Radiology Department

Swindon Hospital

Installation of replacement VRF Air Conditioning systems.

Stainless steel kitchen extract canopy and filtration ductwork with Ansul fire suppression at The Conduit Club, Covent Garden

The Conduit Club - Covent Garden

Convent Garden, London

AFR designed and installed a recirculating kitchen extract system with HEPA and carbon filtration at The Conduit Club, Covent Garden. Ansul fire suppression and kitchen cooling complete a solution built around strict planning restrictions.

Stainless steel kitchen extract canopy with Ansul fire suppression at Waterfront Kitchen, Excel London

Waterfront Kitchen

Excel, London

AFR installed air conditioning, heat recovery ventilation and kitchen extraction with Ansul fire suppression at Waterfront Kitchen, Excel London. ESP filtration and a centralised life safety control system were also incorporated, keeping the front elevation exhaust clean and the kitchen safe.